Lorestan Electricity Aims to Reduce Power Outages
Khorramabad – The CEO of Lorestan Province Electricity Distribution Company said that the Jihadi project to organize critical feeders, and its continuation, are among the company's measures to curb unscheduled power outages.
According to the report of Ambassador Arjan Shirzad Jamshidi, referring to the importance of establishing a physical assets management system, he stated: The implementation of this system is on the agenda with the aim of transforming organizational processes, improving productivity, improving asset management, and achieving sustainable results in various parts of the company's activity.
Developing a road map and forming specialized working groups
He added: In this regard, several infrastructure measures have been taken and other projects foreseen in the physical assets management roadmap are also being implemented in order to provide the field of organizational excellence, increase the efficiency of equipment and improve the quality of service to subscribers.
The CEO of Lorestan Province Electric Power Distribution Company stated: Conducting initial assessments, preparing a gap diagram, developing a road map, forming a high committee and executive specialized working groups, creating an independent physical assets management unit and holding general and specialized training courses are among the basic measures for the establishment of this system in the company.
Organizing equipment and developing intelligent systems
Jamshidi listed the change management and reform of the organizational culture as one of the other axes of this program and said: the implementation of the 5S project in the central warehouse with the aim of organizing goods and spare parts, creating a service workshop for defective transformers and preparing and deploying a comprehensive work management software system (CMMS), are among the operational measures to improve the management of the company's equipment and assets.
He pointed out: The transformation in the organizational structure and the separation of the roles of operation and maintenance, the installation of standard cabins based on 5S principles on operational vehicles and the launch of the advanced system for locating and monitoring vehicles (AVL), are among the other measures taken to increase operational order, better management of resources and improve the performance of executive groups.
Installation of security systems in more than 30 ground stations
The CEO of Lorestan Province Electric Power Distribution Company also announced the installation of smart security systems on more than 30 public land substations and added: The formation of committees and working groups for the root analysis of events and defects (RCA) is also on the agenda with the aim of identifying the causes of problems, preventing the recurrence of failures and increasing the reliability of equipment and network.
Organizing critical feeders to reduce blackouts
In the end, Jamshidi emphasized the importance of reducing unwanted blackouts and increasing customer satisfaction, stating: The implementation of the jihadi plan to organize critical feeders and the continuation of this program is one of the company's important measures to reduce unplanned blackouts, increase the stability of the electricity distribution network, and improve the quality of services to the people of Lorestan province.
He emphasized: the physical asset management roadmap will be followed by the implementation of other planned projects so that the results of this management change can be continuously reflected in the company's performance.