Developing Cultural Infrastructure and Organizing Surface Water Drainage in Bandar Deir
Bushehr – The urban regeneration official at the Bushehr Provincial Roads and Urban Development Directorate reported on a review of urban regeneration projects in Bandar Deir, emphasizing the development of cultural infrastructure and the organization of surface water drainage.
According to Mehr reporter, on Tuesday morning, Bahram Mahmoudi visited two urban regeneration projects, including the public library of Bandar Deir and the surface water disposal channel on Imam Khomeini Street (RA), and reviewed the progress and implementation measures of these projects.
During this visit, referring to the 99% physical progress of the Bandar Deir public library, Mahmoudi said: This project with an infrastructure of 275 square meters and within the framework of a joint cooperation agreement between the General Department of Roads and Urban Development of Bushehr province and the Bandar Deir municipality is being implemented and it was built with the aim of developing cultural infrastructure, increasing public spaces per capita and helping to revive the worn-out urban fabric.
He added: This library is on the verge of completion and its operation after the completion of the remaining measures and the provision of the necessary equipment will provide more access to cultural facilities and services for the citizens.
The head of urban regeneration of the General Directorate of Roads and Urban Development of Bushehr province emphasized the importance of implementing cultural projects within the target areas of urban regeneration and stated: the development of cultural and public spaces, in addition to improving the quality of the urban environment, plays an effective role in strengthening social capacities and improving the living conditions of the residents of dilapidated structures.
Completion of the first phase of the surface water disposal channel project
Mahmoudi announced the completion of the first phase of the surface water disposal channel project on Imam Khomeini Street (RA) in Bandar Deir and said: This project has been implemented with the aim of improving the infrastructure for directing runoff and reducing the risk of flooding of roads and buildings.
Referring to the technical specifications of this project, he noted: The first phase of the canal, 12 meters long and 6.5 meters wide, has been completed in compliance with technical and engineering principles, and the implementation of the next stages of the project can help to complete the surface water management infrastructure and reduce the problems caused by flooding in this area.
He considered the interaction and coordination between the General Directorate of Roads and Urban Development and the Bandar Deir Municipality to be important in advancing urban regeneration projects and emphasized: the targeted implementation of these projects, focusing on the development of urban infrastructure and the promotion of public services, will lay the groundwork for improving the quality of life of citizens and realizing the goals of urban regeneration.