Operational Deployment in North Khorasan Against Flooding
North Khorasan has intensified preventive measures against potential flood damage by carrying out the second phase of its river dredging campaign, clearing riverbeds, channels, and bridge openings. The plan has so far led to the reopening and dredging of 170 vulnerable points across the province.
North Khorasan intensified operational measures to prevent possible flood damage by implementing the second phase of the dredging of rivers, canals and cleaning the mouths of bridges. A plan that has led to the reopening and dredging of 170 vulnerable points in the province.