Abadan Power Grid Prepares for El Niño by Replacing Worn-Out Poles
The director of Abadan's power distribution announced the replacement of 300 worn-out distribution poles in the city's grid, saying the move was taken to boost grid stability and resilience and to prepare for El Niño.
The director of Abadan electricity distribution announced the replacement of 300 worn-out poles of the electricity distribution network of this city and said: This action has been carried out in order to increase the stability and resilience of the network and prepare against the El Nino phenomenon.