85% Progress in Reconstruction of Shor Bridge in Bandar Abbas
Bandar Abbas – The Director General of Roads and Road Transportation of Hormozgan Province announced 85% progress and continued reconstruction of the Shor Bridge on the return route of the Bandar Abbas–Hajiabad road.
Bandar Abbas - Director General of Roads and Road Transport of Hormozgan Province announced the progress of 85% and the continuation of Shore Bridge reconstruction on the return route of the Bandar Abbas - Hajiabad axis.
According to the report of Ambassador Arjan Abbas Sharfi, he said: After the destruction of Shore Bridge following the attacks of the American enemy in July of this year, the reconstruction operation of this bridge with the activities of 6 executive teams has achieved 85% physical progress.
He pointed to the strategic importance of this axis in the movement of goods and passengers and stated: The reconstruction operation of this bridge started on August 5th of this year, and the process of its technical and civil operations is being pursued with the aim of returning the damaged infrastructure to the operational cycle.