Second Phase of Pirbazar River Dredging to Begin Within 48 Hours
Director General of Crisis Management at the Gilan Governor's Office, in an interview with a Safir Arjan reporter in Gilan, announced that the second phase of dredging the Pirbazar River will begin within 48 hours at the latest. He said the land needed to build replacement housing for 17 residential units located in the riverbed has been secured and construction plans are ready.
In a conversation with Ambassador Arjan Gilan's reporter, the Director General of Crisis Management of Gilan Governorate announced the beginning of the second phase of the dredging operation of Pirbazar River within the next 48 hours and said: The land required for the construction of alternative housing for 17 residential units located on the river bed has been secured and construction plans are ready.
According to the reporter of Ambassador Arjan Gilan, Mohammad Ali Vishkaei, Director General of Crisis Management of Gilan Governorate, in a conversation with the reporter of Ambassador Arjan Gilan, referring to the governor's order to speed up the dredging of the Pirbazar River and provide alternative housing for vulnerable families, said: The second phase of the dredging operation of this river will begin within the next 48 hours at the latest with the cooperation of the IRGC's Deputy Construction. Referring to the presence of 17 residential units in the Pirbazar river bed, he added: These residential units have been placed in the river bed for various reasons in the past years, and their presence has been one of the obstacles to dredging operations.
The Director General of Crisis Management of Gilan Governorate stated: According to the order of the Governor of Gilan, it has been decided to build alternative housing for the residents of these units. In this regard, the Islamic Revolution Housing Foundation of the province has provided the required land in the area of Pirbazar and the procedures related to land use have also been completed. Stating that the construction plans of the replacement units have been prepared by the engineering system, Vishkaei said: Part of the construction costs of these units will be borne by the Housing Foundation and the other part by the governorate to start construction of the replacement housing. He also pointed out the need to speed up the implementation of this plan and pointed out that the municipality should also take the necessary measures to issue building permits within the set deadline. In the end, the Director General of Crisis Management of Gilan Governorate emphasized: the simultaneous implementation of the dredging program and provision of alternative housing for the residents of these units will provide the basis for removing the existing obstacles and advancing the dredging operations of the Pirbazar River.