Increasing the power generation capacity despite the difficult conditions/continuing the implementation of water projects

Pointing to the start of water supply operations to 157 villages with a credit amounting to 880 billion Tomans, the Minister of Energy emphasized that despite the pressures and difficult conditions of the country, the implementation of infrastructure projects in the field of water and electricity continues and the measures to develop infrastructure and provide services to the people should not be neglected.

Pointing to the start of water supply operations to 157 villages with a credit amounting to 880 billion Tomans, the Minister of Energy emphasized that despite the pressures and difficult conditions of the country, the implementation of infrastructure projects in the field of water and electricity continues and the measures to develop infrastructure and provide services to the people should not be neglected.