Repair and Reinforcement of Karun River Embankments Begins
The CEO of Shirinshahr Urban Development Company announced the start of repair and reinforcement operations on the embankments along the Karun River to better prepare for potential floods, stressing the need for preventive measures before the rainy season begins.
The CEO of Omran Shirinshahr announced the start of the executive operation to repair and strengthen the flood dams along the Karun River with the aim of increasing preparedness to deal with possible floods and emphasized the need to take preventive measures before the start of the rainy season.