Organizing Flood Channels in Northwest Shiraz

The Shiraz mayor announced the implementation of a project to organize the Mosavat Boulevard channel, including a surface water diversion canal about 600 meters long and eight meters wide. He said the project, which features stone retaining walls, concrete piping, and hydraulic structures, aims to direct runoff toward Ayatollah Alavi Expressway and improve urban resilience to seasonal rainfall, and is currently under way.

The mayor of Shiraz announced the implementation of the project to organize the drainage system of Ejavan Boulevard with the construction of a 600-meter-long and eight-meter-wide surface water channel and said: "This project is being implemented with the implementation of stone walls, concrete piping, and the construction of hydraulic structures, with the aim of directing runoff towards Ayatollah Alavi highway and increasing the city's resilience against seasonal rains."